{"id":2614,"date":"2012-05-08T14:54:00","date_gmt":"2012-05-08T06:54:00","guid":{"rendered":"http:\/\/8.152.7.79:8080\/?p=2614"},"modified":"2022-11-17T23:34:24","modified_gmt":"2022-11-17T15:34:24","slug":"%e6%88%91%e5%85%ac%e5%8f%b8%e5%88%b6%e9%80%a0%e7%9a%84%e5%a4%a7%e5%9e%8b%e8%ae%be%e5%a4%87%e5%9c%a8%e9%9d%9e%e6%b4%b2%e5%ae%89%e8%a3%85%e9%a1%ba%e5%88%a9%e5%ae%8c%e6%88%90","status":"publish","type":"post","link":"https:\/\/china-junye.com\/en\/news\/%e6%88%91%e5%85%ac%e5%8f%b8%e5%88%b6%e9%80%a0%e7%9a%84%e5%a4%a7%e5%9e%8b%e8%ae%be%e5%a4%87%e5%9c%a8%e9%9d%9e%e6%b4%b2%e5%ae%89%e8%a3%85%e9%a1%ba%e5%88%a9%e5%ae%8c%e6%88%90\/","title":{"rendered":"Large-sized Equipment finished Installation at site"},"content":{"rendered":"
\u3000\u3000The 16 sets of large-sized sulfur equipment, including Towers,Vessel sand Heat Exchangers,which were delivered to our customer in 2008, have been finished installation in Africa recently.\n\nIt is the symbol of the success of our design, manufacture and delivery in large batch.<\/p>\n\n\n\n