{"id":2602,"date":"2015-07-18T14:58:00","date_gmt":"2015-07-18T06:58:00","guid":{"rendered":"http:\/\/8.152.7.79:8080\/?p=2602"},"modified":"2022-11-17T23:31:31","modified_gmt":"2022-11-17T15:31:31","slug":"ped%e4%bf%84%e7%bd%97%e6%96%af%e8%ae%be%e5%a4%87%e5%ae%8c%e5%b7%a5","status":"publish","type":"post","link":"https:\/\/china-junye.com\/en\/news\/ped%e4%bf%84%e7%bd%97%e6%96%af%e8%ae%be%e5%a4%87%e5%ae%8c%e5%b7%a5\/","title":{"rendered":"\u00a0Equipment of PED Russian Project is Finished"},"content":{"rendered":"
\u3000In the beginning of 2014, PED Russian project equipment was completed. The equipment was designed and manufactured in accordance with PED\/97\/23\/EC and EN13445 standards, with the material selection, welding and other processes meeting European requirements and winning PED certification. At the earlier stage of this project, we totally grasped different requirements of Euro-standard manufacturing, inspection by deep learning of Euro-standard design, manufacturing and other requirement. The equipment passed strict inspection and got acceptance of customers. The completion of this project symbolized our good capability of designing, fabrication and exporting for Euro-standard equipment in accordance with PED.\u3000<\/p>\n\n\n\n